Operations

infrastructure

Logistics platfrom

This project christened Plexus aims to create a HUG-CHUV logistics platform located in Bussigny.

Operating since 1982, CHUV’s central warehouse occupies a surface area of 2,000 m2 in the centre of the hospital building. These premises would be extremely useful in meeting the needs of the clinical activity. HUG faces the same imperative: reclaiming surface areas and therefore distancing the central warehouse from the central hospital infrastructure.

CHUV and HUG have found a joint solution that consists in grouping the stocks of merchandise and pharmaceutical products (excluding drugs) outside the hospital sites. They will be able to make the most of the surface areas freed up. This approach also optimises operating costs.

The first stone was laid in June 2017. The platform should be operational by autumn 2018.

Last update : 02/07/2018